Product Description
Johnson Systems CD-3000-AE - Strand CD80® AMX or Advanced Electronic (AE) permanent installation racks.
The CD-3000 is a next generation retrofit electronics package designed specifically for any vintage of Strand CD80® dimmer rack. The CD-3000 will replace the aging control electronics of the existing CD80® dimmer rack making system replacement completely unnecessary. This full-featured, ETL listed state-of-the-art unit provides a low cost digital interface to any of today's modern lighting communication protocols.
Designed to install in minutes with only a single screw driver, this elegant package has been designed for longevity and reliability with the end-user in mind. Intuitive LCD user interface combined with a single modular design makes the CD-3000 extremely user-friendly and easily serviceable. Advanced next generation hardware and software designs reduce stand-by power consumption to less than 1 Watt, allowing for compliance with the International Energy Agency's "One Watt Initiative" for standby power consumption. CD-3000 will provide a "Green" dimmer rack!
Full featured, hi-resolution dimming with lightning fast response. Exclusive "lamp warming" techniques extends lamp life considerably. An environmentally and financially responsible solution that offers unsurpassed high performance in a matter in minutes!
Many systems can be upgraded in a few hours at a fraction of the cost (typically 10-20%) of complete dimming system replacement alternatives. Furthermore, electrical contracting is eliminated in most cases further reducing costs and facility downtime. |
Johnson Systems Inc. products are ETL listed and comply fully with UL508 and CSA22.2 No 184 electrical safety approvals. This Internationally recognized safety approval covers the entire assembly specifically for installation into an existing UL approved enclosure (OEM rack) and in no way compromises the electrical safety of the overall system. Official documents available on request.
Features:
- Replaces the old CD80® electronic card cage with new "next generation" control electronics. Upgrades any vintage of CD80® rack in minutes.
- Compatible with O.E.M. dimmer rack wiring for fast easy installation.
- These products are energy efficient and consume less than 1 watt. Compliance with the International Energy Agency's "One Watt Initiative".
- Unique "lamp warming" feature lowers the in-rush current to the dimmer by up to 70% resulting in increased lamp filament life.
- 96 Hi-resolution digital outputs with individual dimmer profile selection.
- Dual opto-isolated DMX512 inputs with built in protocol manager.
- Analog and dedicated dry contact BMS inputs for interface with HVAC, security and fire alarms.
- "Load Shed" inputs for power management and photocell interface.
- LCD user interface for ease of set up and monitoring. Site programmable via a user-friendly, intuitive and self-prompting menu structure. No laptop computer or special software is required!
- Dimmer rack thermal shutdown protection.
- Modular design with a single "plug-in" module.
- Optional Ethernet node supports a wide range of communication protocols including Net2, Strand, ArtNet, ACN (Net3) and Pathport.
- Removable memory dongle permits remote/off site backup of configuration data and ease of future firmware upgrades.
- Up to 10 year product warranty available!
Model | Application |
CD-3000-AE | Strand CD80® AMX or Advanced Electronic (AE) permanent installation racks. |
CD-3000-AE-48RR | Strand CD80® AMX or Advanced Electronic (AE) 48 channel rolling racks. |
CD-3000-AE-96RR | Strand CD80® AMX or Advanced Electronic (AE) 96 channel rolling racks. |
CD-3000-SV | Strand CD80® Supervisor (SV) permanent installation racks. |
NEW! CD-3000-SV-48RR | Strand CD80® Supervisor (SV) 48 channel compact rolling racks. |
NEW! CD-3000-SV-96RR | Strand CD80® Supervisor (SV) 96 channel compact rolling racks. |
CD-3000-C21 | Strand C21 permanent installation racks. |
Please note:
We recommend photos emailed of the racks and any associated house control so we are quoting the correct/most appropriate equipment. This helps eliminate the wrong equipment being ordered and return/restocking charges. We also require a project/facility name to produce a formal quotation and ETL compliance. We are happy to review any photos to qualifying the correct Bill of Materials.